Difference between revisions of "The Irish Solar Pilot Test Facility: Design, Construction and First Period of Operation"
Jump to navigation
Jump to search
(Imported from text file) |
(Imported from text file) |
||
Line 6: | Line 6: | ||
}} | }} | ||
− | [[Category:Book]] | + | [[Category:Book|irish solar pilot test facility design construction period operation]] |
Revision as of 06:52, 2 January 2017
Author | Ian J Cowan |
---|---|
Published | 1982 |
Publisher | Commission Of the European Communities (Luxembourg) |